91精品视频免费观看,久久中文字幕免费视频,久久国产资源,青草福利在线,欧美色偷偷,亚洲一区二区三区免费视频,日韩欧美二区

中文

Kunming Konggang Waste-to-Energy Plant Phase II Project Officially Signed


On May 20, the signing ceremony of Kunming Konggang Waste-to-Energy Plant Phase II Project was held at Sanfeng Environment Headquarters. Wei Qian, Deputy Secretary and Director of the Party Working Committee of the Kunming Konggang Economic Zone Management Committee, and the heads of relevant departments, Sanfeng Environment Party Committee Secretary and Director Chairman Lei Qinping, Deputy Secretary of the Party Committee and General Manager Wang Xiaojun, and Deputy General Manager Wang Jiahong attended and witnessed the signing ceremony.

image.png

The design processing capacity of the project is 800 tons/day. It adopts the process of total waste incineration + semi-dry and dry flue gas purification + residual sanitary landfill. It is equipped with a mechanical grate furnace of 800 tons/day and a 20MW medium temperature sub-high pressure steam turbine generator set. The franchise period is 30 years (including a 2-year construction period). Counting the Phase I project of Kunming Konggang Waste-to-Energy Plant that also invested and constructed by Sanfeng Environment (completed and put into operation in 2012) in, the processing scale of the Phase II project will reach 1,800 tons/ day, effectively guaranteeing the “reduction, recycling and harmlessness” treatment of local domestic waste, and fully meeting the needs of urban development.

After the signing ceremony, the two parties had in-depth discussions and exchanges on the project construction and further government-enterprise cooperation. Wei Qian expressed his gratitude and affirmation to Sanfeng Environment, and said that all bureaus of the management committee would fully cooperate to promote the construction of the second phase of the project. He also hoped that with the continuous development of the Konggang Economic Zone, the two sides could cooperate in other projects such as medical waste treatment and further broaden the scope of cooperation between the two parties.

image.png

Before the signing ceremony, Wei Qian and his delegation also visited the manufacturing base and operation control center of Sanfeng Environmental Headquarters, and spoke highly of Sanfeng Environment equipment manufacturing and intelligent management and control.


Address: 3 Jianqiao Avenue, Jianqiao Industrial Park, Dadukou District, Chongqing, China Tel:(+86) 8805 5666

Chongqing Sanfeng Environment Group Corp. Ltd. All Rights Reserved 渝ICP備50010402000216號(hào)

麦盖提县| 揭西县| 钟祥市| 宁远县| 咸阳市| 莒南县| 博野县| 大方县| 醴陵市| 麻城市| 滨海县| 桃源县| 皋兰县| 闸北区| 尚志市| 通河县| 丁青县| 无棣县| 丰原市| 时尚| 和平区| 温州市| 湖南省| 周至县| 天等县| 岐山县| 通辽市| 左云县| 上虞市| 罗江县| 贡嘎县| 洱源县| 安福县| 忻城县| 内江市| 保德县| 津南区| 三亚市| 昌平区| 玛曲县| 永城市|